昌吉—古泉±1 100 kV特高压线路工程铁塔组立 |
点此下载全文 |
引用本文:徐君辉1,李玉曦1,郑艳红1,马璐2.昌吉—古泉±1 100 kV特高压线路工程铁塔组立[J].电网与清洁能源,2018,34(1):45~50 |
摘要点击次数: 361 |
全文下载次数: 488 |
|
|
中文摘要:从特高压工程铁塔的特点出发,结合工程实际,介绍了可行的特高压铁塔组立方法。为了提高施工效率和施工安全,要依据铁塔的结构、质量及全高采用不同的组合方式进行铁塔施工。为特高压输电线路铁塔组装施工提升装备水平提出了方案,也为今后的特高压线路施工提供良好的借鉴。 |
中文关键词:特高压 铁塔组装 内悬浮外拉线 座地双平臂抱杆 起重机 |
|
Erection Scheme of the Steel Towers of the ± 1 100 kV Changji - Guquan UHV Transmission Line |
|
|
Abstract:Based on the characteristics of the UHV transmission towers and the related engineering practice, a feasible method for assembling and erection of the UHV steel towers is introduced in this paper. In order to improve the construction efficiency and safety, different combinations should be adopted based on the structure, weight and height of the tower for the transmission line construction. This paper also puts forward a scheme for raising the equipment level for assembling construction of UHV transmission towers and provides good reference for construction of UHV transmission projects in the future. |
keywords:UHV steel tower assembly inner suspension line double flat arm hoist crane |